Design assist
Prototyping
Specialty contracting
CBRE
TACK Architects
Cizek Construction
This project was almost a perfect scenario. As the team was working through the design and detailing of various custom elements for DTN’s new office space, they engaged us to assist in the process. By getting involved early, we were able to give them vital feedback. We even got into the nitty gritty details of reviewing the various CNC pattern options and helping them understand machine time and costs associated with each. Through this process, we were able to help the team achieve a design that maximized the potential of the client's budget. The elements we provided spanned both floors of the building and included CNC-machined wall and ceiling panels with varying conditions, signage, custom steel reception design desk, custom steel entry features, and benches.
Time was of the essence during construction, so it was all hands on deck and we installed it in a phased approach within a few days.
Design assist
Prototyping
Specialty contracting
CBRE
TACK Architects
Cizek Construction
This project was almost a perfect scenario. As the team was working through the design and detailing of various custom elements for DTN’s new office space, they engaged us to assist in the process. By getting involved early, we were able to give them vital feedback. We even got into the nitty gritty details of reviewing the various CNC pattern options and helping them understand machine time and costs associated with each. Through this process, we were able to help the team achieve a design that maximized the potential of the client's budget. The elements we provided spanned both floors of the building and included CNC-machined wall and ceiling panels with varying conditions, signage, custom steel reception design desk, custom steel entry features, and benches.
Time was of the essence during construction, so it was all hands on deck and we installed it in a phased approach within a few days.